{"id":87722,"date":"2011-04-20T16:38:40","date_gmt":"2011-04-20T11:38:40","guid":{"rendered":"http:\/\/www.epress.am\/?p=87722"},"modified":"2011-04-20T16:39:33","modified_gmt":"2011-04-20T11:39:33","slug":"120-million-already-spent-on-ensuring-safety-of-armenias-nuclear-facility","status":"publish","type":"post","link":"https:\/\/epress.am\/en\/2011\/04\/20\/120-million-already-spent-on-ensuring-safety-of-armenias-nuclear-facility.html","title":{"rendered":"$120 Million Already Spent on Ensuring Safety of Armenia&#8217;s Nuclear Facility"},"content":{"rendered":"<p>Chair of the RA State Nuclear Safety Regulatory Committee Ashot Martirosyan, meeting with journalists in Yerevan today,\u00a0 compared Armenia&#8217;s Metsamor Nuclear Power Plant (MNPP) with Japan&#8217;s Fukushima.<\/p>\n<p>&#8220;Our nuclear power plant has two contours, whereas there&#8217;s had one. And when the pressure in their plant went up, their reactors were forced to emit large quantities of radioactive gas to the surrounding environment. If a similar situation were to occur in our NPP, it&#8217;s not radioactive gas that will be emitted from the reactor, but from the steam generators, where there is clean water and no radioactivity,&#8221; he said, adding that Fukushima consists of boiling water reactors (BWR), which does not satisfy current demands.<\/p>\n<p>According to Martirosyan, though the MNPP is equipped with more safety systems, it&#8217;s still not enough and additional work has to be carried out to increase safety levels.<\/p>\n<p>The state nuclear safety committee chair said that since 1993, $120 million US overall has already been spent on safety systems and another $20 million US will be spent till all the work expected to increase the nuclear facility&#8217;s safety is completed.<\/p>\n<p>Martirosyan said all issues connected with the construction of a new nuclear facility are currently frozen and they are waiting for the final results of the analysis of the Fukushima accident, after which most likely they&#8217;ll take measures to ensure the new facility meets more rigorous requirements.<\/p>\n<p>&#8220;So that the new nuclear power plant meets the requirements which will be set by the international community, taking into account lessons from Fukushima,&#8221; he said.<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Compared Armenia&#8217;s Metsamor Nuclear Power Plant (MNPP) with Japan&#8217;s Fukushima, Chair of the RA State Nuclear Safety&#8230;<!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":1,"featured_media":87635,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"tstyn_error":""},"categories":[10],"tags":[10621,19415,10623,24013,10622,19416,23645],"_links":{"self":[{"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/posts\/87722"}],"collection":[{"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/comments?post=87722"}],"version-history":[{"count":0,"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/posts\/87722\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/media\/87635"}],"wp:attachment":[{"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/media?parent=87722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/categories?post=87722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/epress.am\/en\/wp-json\/wp\/v2\/tags?post=87722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}